Timeline of Facts and dates

1945 Government Decree No.390/159 on Establishment of OKB.
1948 First "A" production reactor startup (OKBM is the reactor unloading mechanism designer).
1949 First industrial batch of enriched uranium obtained at the D-1 factory (OKBM is the diffusion machines designer).
1950 Pilot ОК-110 production reactor startup (OKBM is the reactor designer).
1951 First ОК-180 heavy-water reactor startup (OKBM is the reactor designer).
1955 Advanced ОК-26 diffusion machine commercial production for the uranium enrichment plant was started.
1955 ОК-190 production heavy-water reactor startup (OKBM is the reactor designer).
1957 First atomic submarine reactor physical startup (OKBM developed the reactor detailed design and ground-based test facility).
1958 ОК-120 production uranium-graphite reactor startup (OKBM is the reactor designer).
1959 The "Lenin" nuclear ice-breaker was commissioned (OKBM is the NSSS designer).
1967 Generation II lead submarines service was started (OKBM is the NSSS designer).
1970 Upgraded NSSS operation in the "Lenin" icebreaker was started (OKBM is the NSSS designer).
1972 First-in-the-world pilot BN-350 fast neutron reactor physical startup
1975 The "Arktika" nuclear ice-breaker was commissioned (OKBM is the NSSS designer).
1977 The "Sibir" nuclear ice-breaker was commissioned (OKBM is the NSSS designer).
1980 Physical startup of reactors in the "Kirov" nuclear cruiser (OKBM is the NSSS designer). BN-600 fast neutron reactor physical startup.
1980 First Generation III atomic submarine was commissioned (OKBM is the NSSS designer).
1985 The "Russia" nuclear ice-breaker was commissioned (OKBM is the NSSS designer).
1987 Advanced L-2 heavy-water reactor physical startup (OKBM is the reactor designer).
1988 The "Sevmorput" nuclear lighter-aboard ship was commissioned (OKBM is the NSSS designer).
1989 The "Soviet Union" nuclear ice-breaker was commissioned (OKBM is the NSSS designer).
1990 The "Vaygach" nuclear ice-breaker was commissioned (OKBM is the NSSS designer).
1992 The "Yamal" nuclear ice-breaker was commissioned (OKBM is the NSSS designer).
1996 NSSS protopype with an integrate type reactor was commissioned (OKBM is the NSSS designer).
1998 The "Peter the Great" nuclear cruiser was commissioned (OKBM is the NSSS designer).
1998 TVSA fuel assembly operation in the VVER-1000 reactor at the Kalinin NPP was started (OKBM is the fuel designer).
2001 First batch of submerged pumps was commissioned and delivered to the construction site of the Tianwan NPP in China.
2002 Activities on increasing the safety and extending the service life of the АDE-2,4,5 production uranium-graphite reactors.
2003 Blanket components for the ОК-187 М electronuclear neutron generator were commissioned and delivered to SSC RF ITER.
2003 The "Arktika" icebreaker navigation started with an extended service life Nuclear Steam-Supply System (NSSS).
2004 Construction and acceptance tests of the equipment for the CEFR experimental reactor (China) were completed.
2005 Steam generating unit fabrication for Generation IV atomic submarines was completed.
2006 BN-800 reactor construction was recommenced at the Beloyarsk NPP.
2006 Construction of floating power unit based on КLТ-40 RP was started.
2007 Commissioning of nuclear icebreaker "50 Let Pobedy".
2009 First set of TVSA-Ts was supplied to the Temelin NPP, Chech Republic.
2011 Chinese Experimental Fast Reactor (CEFR) was commissioned.
2015 Commissioning of BN-800 reactor at the Beloyarsk NPP.
2016 Packaged delivery of RITM-200 reactor plant equipment for nuclear icebreaker "Arktika".
2017 Extended service life of nuclear icebreaker "Vaigach" reactor plant.
2018  First criticality and first electricity generation of KLT-40S reactors of FNCP Akademik Lomonosov.